We develop personalized covers based on the business & client's requirements. Please contact our customer service for inquiries or fill and submit contact request.
The Erection All Risk policy is specially designed to cover loss or damage to projects that involves erection/installation of plant, machinery and equipment ranging from erection of a single machine to a large power plant.
This is an "All Risk" policy covering various activities of erection/installation, testing and commissioning of plant and equipments (except specific exclusions as mentioned in the policy). It protects a contractor or employer against physical loss or damage to the contract works, construction plant and equipment or machinary. It also includes cover for damage to property of third parties and bodily damage to third parties.
The policy can be taken out in the joint names of the contractor and the employer. This policy enables the Contractor or Employer to comply with the insurance requirements of the Contract
What to do next?
We develop personalized covers based on the business & client's requirements. Please contact our customer service for inquiries or fill and submit contact request.
Cover can be designed according to the specific needs of the project
Optional extensions which can be tailored to suit individual customer's needs
Specialized team of Engineers available to help in implementation of risk management measures
Dedicated team of Claims specialists
Our presence across the length and breadth of GCC (except Kuwait)
It is also possible to have an annual policy issued for all work undertaken by a contractor
What to do next?
We develop personalized covers based on the business & client's requirements. Please contact our customer service for inquiries or fill and submit contact request.
This policy (Section 1) covers risks associated with storage, assembly/erection and testing of Plant and Machinery. EAR insurance provides comprehensive cover. All perils are covered unless specifically excluded.
Section 2 of the policy covers legal liability falling on the insured contractor as a result of bodily injury or property damage belonging to a third party.
Sum Insured
Sum to be insured is the completely erected value of the plant and machinery inclusive of freight, customs duties and cost of erection.
Period of Insurance
The cover starts on the unloading of the first consignment at site or commencement of work and continues to be in force as stated in the policy including the test run period. The policy ceases when the project is handed over to the principal or put into service.
On request the policy can be extended to cover various optional extensions viz. Transit to or from the site (excluding sea or air transit), testing and commissioning, maintenance cover, removal of debris costs, architects, surveyors fees for the reinstatement of damage, damage to surrounding property, etc
Contact AXA
+971 4 324 34 34
Sun to Thu 8am to 5pm.
Ground Floor, Wafi Residence, Opposite Dubai Health Care City, Oud Metha Road
Telephone: +971 4 324 34 34
Building 11 A&B, National Consultative Council Complex, Delma Street, (Street No. 13) Al Nahyan Camp Area
Telephone: +971 2 495 79 99
Ground Floor, Kanoo Building, Off Al Arouba Street, Behind Al Rostamani / Sharjah Exchange
Gate 4, LOB 16, Ground floor, Office 36, JAFZ (Free Zone pass needed to enter Jebel Ali Free Zone)
Telephone: +971 4 881 96 96
Dubai Internet City -Building 6, Ground Floor, next to Al Ansari Exchange